Projected vs Incurred Costs

Prev Next

A Homeowner’s Guide to Organizing Insurance Claim Documentation

Managing Estimates, Invoices, and Everything In Between

When you're navigating a Property Insurance claim, especially after a major loss, the paperwork can pile up fast. Between Contractor bids, rental agreements, receipts, permits, and insurance forms, it’s easy to get overwhelmed. But staying organized isn't just about peace of mind—it’s essential to getting paid what you’re owed.

At the heart of your documentation strategy should be a clear separation between projected costs and incurred costs, with all expenses mapped to specific coverage buckets. This article breaks down how to do that effectively, what to expect from your insurer, and how to stay ahead of the paperwork chaos.

Why Documentation Organization Matters

Insurance companies require proof. Proof that your expenses are valid, that you’ve used the funds they advanced, and that you’re still owed for items that haven’t been funded yet. Without clear documentation:

  • Payments can be delayed

  • Certain items may be denied

  • You may end up paying out of pocket unnecessarily

  • Supplementals may be harder to justify

Most importantly, your insurer will expect a dollar-by-dollar accounting of how funds are used—from the very first advance to the final supplement.

Understanding Projected Costs vs. Incurred Costs

Projected Costs

These are estimates of what future work or expenses will cost. You submit these to your insurance company as part of your claim documentation. They form the foundation for initial payments (often under Dwelling, Other Structures, or Loss of Use).

Examples:

  • Contractor estimates or bids

  • Xactimate estimates (if you hire a Public Adjuster such as Loti)

  • Engineering or architectural proposals

  • Temporary housing contracts or rental agreements

  • Vendor bids for tree removal, engineering work, etc.

    These are often used to justify advance payments or budget coverage under a specific policy limit.

Incurred Costs

These are actual expenses—payments you’ve made or bills you’re obligated to pay. Over time, some projected items get converted to incurred costs as invoices roll in or insurers "push" them into paid proof requirements.

Examples:

  • Paid invoices from architects or engineers

  • Permit fees

  • City planning or impact fees

  • Final payments to contractors or vendors

  • Receipts for rental housing or storage units

    You’ll need to provide proof of payment or obligation (invoices, receipts, cleared checks, bank statements) to recover these.

What Gets Pushed to Incurred Costs—and Why

Insurance adjusters may shift certain line items out of the initial scope and classify them as “bid items” or “incurred-only” expenses. This typically includes costs that:

  • Vary significantly based on your vendor choices

  • Are difficult to estimate in advance

  • Are considered contingent or discretionary in your policy

Examples commonly pushed to incurred:

  • Architectural fees

  • Engineering reports

  • Permits and impact fees

  • Surveying or environmental testing

  • Plan review costs

  • Title fees for temporary housing rentals

    What gets moved often depends on the specific language of your policy—some include these within Dwelling, others consider them separate. Loti can help with this.

Organizing Your Paper Trail

To stay on top of it all, we recommend organizing your documents into two main tracking categories, each with subfolders or tabs by coverage bucket.

1. Projected Costs Folder

Include:

  • Contractor bids

  • Xactimate reports

  • Draft vendor estimates (tree removal, electrical, foundation, etc.)

  • Rental agreements (housing, equipment)

  • Proposals from architects, engineers, consultants

  • Scope of loss estimates from your public adjuster (if applicable)

Sort by Coverage Bucket:

  • Dwelling

  • Other Structures

  • Contents

  • Loss of Use

  • Debris Removal

  • Code Upgrades / Ordinance & Law

2. Incurred Costs Folder

Include:

  • Paid invoices

  • Credit card or check payments

  • Receipts and expense logs

  • Contracts with clear payment obligations

  • Permit receipts, architectural fees, or planning invoices

  • Temporary housing reimbursements with supporting docs

Tip: Keep a running ledger (Excel, Google Sheet, or a claims tool) that tracks all expenses from dollar zero. When it’s time to request a supplement or reconcile funding, this makes it far easier.

Example 1: Engineering Fee Moved from Estimate to Incurred

You receive an estimate from your engineer for $4,500 to evaluate soil conditions and create plans. Initially, you include this in your projected Dwelling costs. But the insurer flags it as a “bid item” and refuses to fund it in advance. You move it to your “incurred” file and pay the engineer. Once the Invoice is in hand, you resubmit with proof—and the cost is reimbursed as part of a supplemental claim.

Example 2: Using Estimates to Justify Extended ALE

You get a rental estimate showing it will cost $3,800/month for the next 6 months due to delays in permit approvals. You submit the contract under the Loss of Use bucket. The insurer approves an initial amount based on the estimate, but later requires actual receipts for continued payments. By keeping the estimate and matching receipts organized, you avoid a gap in reimbursement.

Best Practices for Staying Organized

  • Use cloud storage (Google Drive, Dropbox, etc.) with clearly labeled folders by cost type and coverage bucket

  • Name files consistently: e.g., “2024.02.15_PermitInvoice_CountyofLA.pdf”

  • Keep a master expense tracker: Dates, vendors, amounts, status (projected vs. incurred), insurance coverage type

  • Request invoices in PDF rather than just in emails or texts

  • Save all communications with vendors and adjusters

  • Scan handwritten receipts from smaller vendors

  • Tag everything with the related room/structure if possible (e.g., “Garage Roof Demo Bid”)

Wrap-Up

Organizing your documentation may not feel urgent in the early days of a disaster recovery—but it becomes critical fast. The more clearly you can show what you’ve spent, what you plan to spend, and which costs map to which coverage, the smoother your claim will go.

Yes, it’s a hassle. But the time you invest up front in structuring your documents will pay dividends when it's time to request supplements, justify incurred costs, or push back against denied coverage.

If you're working with a licensed public adjuster, they may help structure this for you using tools like Xactimate, cost tracking logs, or custom coverage maps—especially for complex or multi-layered claims.